Projects Executed by Ingeniería Serur, CA

Victor R. Serur has more than 38 years of experience in the business of Earthmoving & Site Works.

Client: Ministry of Environment and Natural Resources

Work: "Culmination Construction Dam The Flood (Tres Ríos)"

Location: Maracaibo, Edo. Zulia.

Executed Work: Construction of Dam (Completed), Construction of Spillway (100% Completed).

Amount executed: 171,20 MM Bsf.- (36,5 MMUS$).

Performance Work: Earth Movement: 2,000,000 m3 / year.

Concrete drainage capacity: 12,000 m3 / year.

Construction Period: 2004-2008.

Client : Ministry of Environment and Natural Resources. (MARN)​

Work: Excavation and Coating of the Two Bocas Dam Diversion Tunnel.

Location: Acarigua , Edo. Portuguesa .

Executed Work: Construction of Tunnel Access Road.

Amount executed: 79,00 MMBsf. - (18,4 MMUS$)

Construction Period: 2006-2008.

Client: Ministry of Popular Power for Housing and Habitat.

Work: Construction of the First Access Road Section of Los Indios 

Location: Caracas-La Guaira Axis. Urb. Camino de los Indios. Vargas 

Executed Work: Construction of the Access Highway to the Camino de los Indios Urb: Excavation, Landfill, Drainage Works, Concrete. (100% Completed)

Amount executed: 516.00 MMBsf. - (37.6 MMUS $).

Construction Period:  2009-2012.

Client: Fundabarrios

Work: Urbanism "Alicia Pietri de Caldera"

Location: Los Guayos, Valencia, Edo. Carabobo.

Executed Work: Elimination of Vegetal Layer, Terraceo, Whitewater Services, Sewage, Rainwater, Roads, Post-tensioned Storage Tank A.B. Capacity 1MM of Lts.

Area Worked: 60 Ha

Construction Period:  1999-2000.

Work: Urbanism "Juan Pablo II"
Location:Barinas, Edo. Barinas.
Executed works:Elimination of Vegetal Layer, Terraceo, Whitewater Services, Sewage. Projects of White Waters, Sewage, Rainwater and Electricity
Area Worked: 7 Ha
Construction Period: 2000-2001.

Work: Urbanism "Llanos de Monay"
Location: Monay, Edo. Trujillo
Executed works: Elimination of Vegetal Cloak, Terraceo.
Area Worked: 20 Ha
Construction Period: 2001.

Client: Ministry of Environment and Natural Resources. (MARN)
Work:"Marginal Dam Bridge Swirl - La Manga, Right Bank of the Apure River"
Location:Guasdualito, Edo. Hurry.
Executed works:Elimination of Vegetal Layer, Embankments, Construction of Groynes
Work Area: Prog: 8 + 500 to 10 + 500
Construction Period: 2002-2003.

Other Projects.

Works for Fundacomún - Cameba.


1. Cable-stayed screens in different neighborhoods.
2. Coating of shocrete of the pipe diameter of 3.54 mts. In the Queora Conorapa in Petare.
3. Construction of packing of Quebrada La Vega.
Construction Period: 2002 to 2004.

Work: Road Construction - L006 Santa Elena - Icabaru
Construction Period: 2003.

Work: Construction of waterproof breakwaters to stabilize the curve in the Puente Remolino - La Mangaedo Apure section.
Construction Period: 2003.


Work: Earth movement Store Makro. Paraguaná. Edo. Falcon
Construction Period: 2003.

​

Work: Stabilization of erosion gullies. Tacoa Edo Vargas
Construction Period: 2000.

​

Work: Cable-stayed screen construction. Edf Los Naranjos de Las Mercedes. Mr. Eduardo Solar.
Construction Period: 2000.


Work: Anchoring of support wall in Plot N0. 22, Av. Sur 2, Urb. Los Naranjos de El Cafetal. Arq. José Oraá .
Construction Period: 1999.


Work: Construction of micro piles based on foundations. Casa Flia Marín located in the Oripoto urbanization. Alto Hatillo Caracas.
Construction Period: 1999.

Works Executed by Transporte y Construcciones Serur, CA

Work: Construction of micro piles based on foundations. Casa Flia Talamo located in the Monte Elena urbanization. You belong Caracas.
Construction Period: 1998.

 

Work: Construction Spiked screen of 3,600 m2 in progressive 18 + 300 to 18 + 500, in slope from the tunnel Sector El Peñón, Consorcio Contuy Medio Astaldi with Trevi Foundations. Ferrocar. Located in Charallave.
Construction Period: 1998.

 

Work: Construction of spiked screen. Area 180 m2 in slope Parcel 1 Module 5. Development Country House. Urb La Tahona. Concalpro.
Construction Period: 1998.

 

Work: .Construction of micro piles on the basis of stairs foundations. Module No. 7a and 8. Country House Development. Urb La Tahona. Concalpro
Construction Period: 1998.

 

Work: Stabilization of slope Preschool Barrio San José. Real Street of Carapita. Parish Antimano. Mayor of Libertador Municipality. Caracas.
Construction Period: 1998.

 

Work: Slope stabilization in the La Tahona urbanization. Mayor of the Baruta Municipality. Caracas
Construction Period: 1998.

 

Work: Construction of micro piles based on foundations. House Flia. Fernández Located on La Loma street. Alto Hatillo Urbanization. Caracas
Construction Period: 1998.

 

Work: Construction of micro piles to traction in office - Casa Flia. Altuna Located on La Loma street. Alto Hatillo Urbanization. Caracas
Construction Period: 1998.

 

Work: Construction of micro piles based on footbridge foundations on Francisco Fajardo highway. Urb Montalbán Andrés Bello Catholic University and Metro CA.
Construction Period: 1998.

 

Work: Spiked screen construction, Hoyo de la Puerta Hole Sector. Hidrocapital.
Construction Period: 1998.

 

Work: Construction of micro piles for the strengthening of foundations buildings blocks 38 and 39, Inavi, Guarenas.
Construction Period: 1998.

 

Work: Various renovations in the Merici Academy educational unit in Venezuela, Cerro Verde, Caracas.
Construction Period: 1998.

 

Work: Slope stabilization with cable-stayed screen in parcels nº 2 and 4, Development Casa de Campo, Urbanización La Tahona, Caracas.
Construction Period: 1998.

 

Work: Sub-contract with Trevi Cimentaciones, C.A. for the construction of a temporary cable-stayed basement screen, Av. San Juan Bosco, between 3rd. and 4th. cross section, Altamira, Caracas. Jacobo Menasche Real Estate.
Construction Period: 1998.

 

Work: Slope stabilization with cable-stayed screen in plot no. 8, Casa de Campo Development, La Tahona Urbanization, Caracas.
Construction Period: 1997.

​

Work: Construction of micro piles on the basis of a cable-stayed screen plot No. 8, Development of Country House, La Tahona Urbanization, Caracas. Constructora Concalpro.
Construction Period: 1997.

​

Work: Construction of micro pilings based on foundations plot No. 1, module No. 5, Development Casa de Campo, Urbanization La Tahona, Caracas. Constructora Concalpro.
Construction Period: 1997.

​

Work: Metal structure construction 27 ton. plot nº 3, module nº 4, Development Casa de Campo, Urbanization La Tahona, Caracas. Constructora Concalpro.
Construction Period: 1997.

​

Work: Stabilization of structural wall with deep anchors, development of the canyon, Caicaguana Urbanization. The Hatillo. Caracas. Constructora Concalpro.
Construction Period: 1997.

​

Work: Patroleum and conditioning between Quebrada Seca and Chuspa, Gobernación del Distrito Federal
Construction Period: 1997.

​

Work: Paving between Quebrada Seca and La Sabana, Gobernación del Distrito Federal
Period of Construction: 1996.

​

Work: Stabilization of slope house flia. Hernández, Lomas de la Trinidad. date jul 96
Period of Construction: 1996.

​

Work: Reconstruction of Caruao stadium, Caruao parish, Governorate of the Federal District.
Period of Construction: 1996.

​

Work: Reconstruction of Plaza Divino Niño de Caruao, Caruao Parish, Gobernación del Distrito Federal.
Period of Construction: 1996.

​

Work: Perforation to roto-percussion on existing cable-stayed screen for the placement of new geo-drains, Constructora Arkinpro, Altamira high-rise work,
Period of Construction: 1996.

​

Work: Stabilization of talud highway El Junquito km. 3, between Callejón La Gallera and Calle La Pica, Parroquia Sucre, Libertador Municipality. Mayor of Libertador Municipality.
Period of Construction: 1996.

​

Work: Perforation to roto-percussion on existing cable-stayed screen for the placement of new geo-drains, Constructora Arkinpro. Upper part of Altamira
Period of Construction: 1996.

​

Work: Stabilization of slope breezes of Propatria, El Junquito highway km. 3, between callejón la Gallera and la Pica (ii stage), Parroquia Sucre, Municipio Libertador. Municipality of Libertador Municipality.
Period of Construction: 1996.

​

Work: Slope stabilization, Brisas a Primavera, the observatory, Parroquia 23 de Enero, Municipio Libertador. Municipality of Libertador Municipality.
Period of Construction: 1996.

​

Work: Slope stabilization, Brisas a Primavera (II stage), the observatory, Parroquia 23 de Enero, Libertador Municipality. Municipality of Libertador Municipality.
Period of Construction: 1996.

​

Work: Project for recovery and maintenance of roads in:
1.- Av. José María Vargas,
2.- Av. Arturo Michelena,
3.- Av. Arístides Rojas,
4.- Av. Manuel Felipe Tovar, and,
5.- Av. Guaicaipuro,
San Bernardino Parish, Libertador Municipality.
Construction Period: 1995.

​

Work: Reconstruction of roads, located behind the school Muñoz Tébar, edf. Puy and Guamacho, La Floresta sector, Coche Parish, Libertador Municipality
Construction Period: 1995.

​

Work: Leveling and replacement of inos grids, block 12 of Propatria, Parroquia Sucre, Libertador Municipality.
Construction Period: 1995.

​

Work: Rescue of the central island located in the main avenue of the Cemetery, Santa Rosalía Parish, Libertador Municipality.
Construction Period: 1995.

​

Work: Repair and improvement of old road roads Los Teques-Mamera, Parish Antimano, Libertador Municipality.
Construction Period: 1995.

​

Work: Stabilization of slope and remodeling of the headquarters of the parochial meeting Av. José Ángel Lamas, San Juan Parish, Libertador Municipality.
Construction Period: 1995.

​

Work: Reconstruction of Plaza Bolívar, Intercomunal del Valle Avenue, Parroquia el Valle, Libertador Municipality.
Construction Period: 1995.

​

Work: Highway 1 Caracas-Chuspa, Gobernación del Distrito Federal.
Construction Period: 1995.

​

Work: Reconstruction of sidewalks and curbs (2nd stage), located in sector ud-3, main Ave. la haciendita, Caricuao Parish, Libertador Municipality.
Construction Period: 1995.

​

Work: Slope stabilization behind the house. Pérez, located in Lomas de Prados del Este.
Construction Period: 1995.

​

Work: Slope stabilization, located behind the school Muñoz Tébar, edf. Puy and Guamacho, Sector La Floresta, Car Parish, Libertador Municipality
Construction Period: 1995.

​

Work: Project, calculation and construction of Casa de Campo, floating slab, structure in steel conduven, area of the house 240 m2, land area 26,700 m2, earth movement 2,000 m3, flia. from the cross.
Construction Period: 1995.

​

Work: Construction and remodeling Centro Comercial Serur, Guacara, edo. Carabobo
Construction Period: 1994.

​

Work: Calculation and construction of anchored perimeter wall, earth movement, foundation foundations and steel structure in conduven steel, casa flia. Mainardi, Oripoto.
Construction Period: 1994.

​

Work: Calculation and construction of a retaining wall anchored in the San Miguel neighborhood, La Escalera sector, 1 st. De Mayo, Santa Rosalía Parish, Libertador Municipality.
Construction Period: 1994.

​

Work: Slope stabilization, Las Brisas el Amparo sector, Pasaje 16, Sucre Parish, Libertador Municipality.
Construction Period: 1994.

​

Work: Construction of drainage systems, support wall and road construction, La Chinita sector, Real de Carapita street, intersection 4 ta. La Chinita Street, Antimano Parish, Libertador Municipality.
Construction Period: 1994.

​

Work: Construction and reconstruction of stairs, sidewalks, gutters, railings and sewage collector, Blandin neighborhood, Caracas-la guaira old road, Sucre Parish, Libertador Municipality.
Construction Period: 1994.

 